Key advantage:
1)Top client: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil etc.
2)90% exported to 40 countries like Germany, America, Slovakia,Saudi Arabia, South Africa, Oman etc.Total weight 400,000tons.
3)Certificate:
ISO9000, ISO14000, ISO18000 by BV France
EN-1090 CE certificate
American CWI
European TWI
European IWE
1.Our designers use the latest software tools available and these include the Fastrak and Masterseries suites. This allows collaboration of models with the clients teams throughout the design process.
All projects are modelled using the industry leading Tekla Structures software. We have over 15 years experience of using Tekla for 3D modelling. The Tekla 3D model is fully BIM compatable and allows us to participate in all types of collaboration.
2.Sustainability
Our company is committed to achieving £¬maintaining sustainable practices in all aspects of our work.
Steel is recyclable and is being promoted to designers because it is sustainable and an environmentally friendly form of construction compared to concrete. We promotes sustainability through its Steel Construction Sustainability Charter.
3.SUSTAINABILITY
We work to mitigate the impact upon the environment.
At our head office, water usage and the amount of waste going to landfill have both substantially reduced, positively influencing our carbon footprint.
We are one manufacturers of steel structures to hold BES 6001, the British Standard for responsible sourcing. This award enables our clients to obtain credits under the BREEAM system, and improve their own sustainability
4.Project case: Jining Xinxiuyuan Office Building project
Project Overview:
Construction of a 10 storey steel frame structure in busy city centre busines area to accommodate a new office development. The building has a Grade A listing, which required the fa ade and ground floor former banking hall to be retained during structural alteration. The old interior was otherwise completely demolished, leaving an empty shell to be in-filled with a new frame. The metal decking contract was incorporated within the steelwork package
5.Project case: Zouping High School, Binzhou
Contracts in the thriving education sector range in capacity and geography from: 200 - 1500 tonnes;
Here are details of just a few of our many installations:
Zouping High School is a new-build high school to replace the existing school, which was demolished just before our site start.
The project involved the construction of a 2/3 storey school with both dual and monopitched roofs and a waveform curved roof to the games hall.
6.Our project in Africa
In West Africa our buildings are almost everywhere, from Mauri, Senegal, Liberia, the Ivory Coast, Benin,Dahomey, Cameroon and Equatorial Guinea right down to the Congos and Angola. For Zambia we made a hovercraft hangar.
A multi-storey hotel building at Banjul in The Gambia is helping the tourist trade whilst further up the riverKanifing are a variety of stores and warehouse buildings. We also supplied all the steelwork for the new fish and meat market.
7.We have been involved in“steel construction architecture”supply for many years.
It has different names like below:
prefab architecture
metal building architecture
architectural steel buildings
steel building architecture
we have very good reputation in this field all over the world.